Skip to main content

Drainage letter: There was a regrettable error made in the processing of the mailing list. If you received mail from Waikato Regional Council to your address but in another person’s name, please dispose of it. The information will be resupplied.

Close alert

Waihou Valley Scheme – Service Level Review

TR 2012/12

Report: TR2012/12

Author: Murray Mulholland

About the document

This report presents a review of service levels for the Waihou Valley Scheme main floodway stopbanks, stoplogs and spillways. As assessed in this review, the current performance of the Waihou Valley Scheme main floodway stopbanks is marginal in terms of the Zone Management Plan performance target (i.e. no more than 2% of stopbanks are below design flood level). Approximately 2% by length (2.5 km) is within performance category 5 indicating that remedial work is required within the next 3 years. 

Read the document

Waihou Valley Scheme – Service Level Review [PDF, 5.6 MB]